Installation of an Europelec scraper bridge at the Nestlé site wastewater treatment plant in Boué

The Nestlé industrial site in Boué operates its own wastewater treatment plant to process effluents. Commissioned over 30 years ago, the facility was showing signs of aging, increasing the risk of malfunctions.

With a strong commitment to maintaining the reliability of its treatment system, the site management decided to replace the existing clarifier bridge with a brand-new piece of equipment, compliant with today’s technical standards and designed to last.

This project was awarded thanks to a comprehensive technical approach, which was highly appreciated by the client:
• In-depth analysis of the specifications for the future scraper bridge
• On-site preparation and coordination of dismantling and installation operations, with a strong focus on safety

Thanks to the installation of a tailor-made new clarifier bridge, the clarification step is now fully secured. Nestlé benefits from a reliable and durable solution, with a single point of contact at each stage — from consultation to commissioning.

Want to know more about our scraper bridge : https://www.sfa-enviro.com/products/scraper-bridge/